Entity documents, formulas, ingredient ledgers, the SJPH manual and staff training can all progress during fit-out, and the LHLN may begin document review so the on-site audit can be arranged once construction ends.
Equipment must be installed with trial production completed, and real dosing, batch and cleaning records available for review; an unfinished site cannot demonstrate separation or flows.
File the application noting the expected completion date, use the actual site address on the certificate, and revise the layout plan after the move. Check composition data for adhesives and waterproof coatings before entry, avoid large volatile volumes in enclosed spaces, accept ventilation, explosion-proof lighting and access control with the main build, and run equipment empty with cleaning verification before trial batches. Inventory old-site ingredients and packaging so unreviewed materials do not enter the new address, file training attendance and assessment records in advance, and update utility lines on the drawings. Nothing here constitutes a commitment regarding the audit outcome.
Good Fortune Halal Certification Service (Qingdao) Co., Ltd., as a BPJPH-authorized LHLN, provides one-stop BPJPH Halal certification services for enterprises nationwide. Free pre-assessment, formula compliance review, on-site factory audit tutoring, with full bilingual one-on-one support.