[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"faq-detail-halalcn.com-185":3},{"zh":4,"en":33},{"cur":5,"prev":12,"next":17,"related":22},{"@type":6,"q":7,"a":8,"id":9,"category":10,"extended":11},"java.util.HashMap","清真认证提交后到发证前，可以中途追加产品吗？","可以提出，但不能自行并入原申请。BPJPH以登记的产品清单为准，新增SKU须在SIHalal系统提交变更补充材料，LHLN对追加产品重新审查配方与原料；若现场审核已结束，可能需要补充核对。追加会打断既有审查节奏，建议立项时一次性锁定SKU清单和包装名称。",185,"办理流程与周期","### 处理规则\nBPJPH受理范围以系统登记产品表为准，提交后新增口味或规格不能“搭车”出证，必须走变更登记，重新提供配方、配料表与供应商清真证书。\n### 对进度的影响\n若追加产品处于MUI fatwa审议阶段，新增项通常单独排队审查，已审产品不因此被否决；涉及新产线或动物源原料时还需补做现场核对，具体由LHLN审核员判断。\n### 实务建议\n申报前冻结SKU清单，包装品名与商业发票保持一致；确需追加应尽早通过LHLN书面报备。\n### 批次与单证\n追加产品涉及库存的，已生产批次按批次隔离存放、单独标识，不得混入已申报范围出货；新增SKU的品名、规格在变更回执确认前不要印制外箱和发票。企业应保留变更回执、补料邮件与审核员确认记录，并据此调整船期；多个追加项一次汇总提交，比分次零散追加更便于审核组核对。不构成对审核结果的承诺。",{"@type":6,"q":13,"a":14,"id":15,"category":10,"extended":16},"清真认证的\"首次认证\"和\"扩项\"在流程上有什么区别？","首次认证需建立SJPH体系、完成全套文件审查与现场审核，经MUI出具fatwa后由BPJPH发证，有效期4年。扩项是在持证期间增加产品、配方或产线，须提交变更申请和新增部分资料，LHLN做针对性审查，必要时补充现场审核，审核范围限于新增内容。",184,"### 首次认证\n营业执照、工厂布局、SJPH手册、配方与供应商证书整套提交，BPJPH受理后由LHLN做文件审查加现场审核，再经MUI出具fatwa，最后BPJPH核发有效期4年的证书。\n### 扩项情形\n新增SKU、新原料、新产线或新车间都属于变更，企业在SIHalal系统提交变更并附配方表、工艺图；若新产品与已认证产品共线且工艺相似，文件审查通常即可，引入高风险新原料时会安排补充审核。\n### 注意\n扩项不改变有效期，证书有效期仍与原证书一致。\n### 选择判断\n企业可据此安排节奏：新主体、新工厂按首次认证预留完整体系搭建与审核时间；已持证企业先确认新增内容是否落在现有产线与原料类别内，落在范围内走扩项变更，落在范围外（如新车间、动物源原料）则按补充审核准备，新增资料单列清单并加盖公章，避免与原卷宗混装。不构成对审核结果的承诺。",{"@type":6,"q":18,"a":19,"id":20,"category":10,"extended":21},"清真认证中的\"企业内部评审\"和\"LHLN评审\"有什么区别？","内部评审是企业按SJPH要求自查体系，由本团队对照清单检查原料、产线与记录。LHLN评审是BPJPH认可的外国清真认证机构独立审查配方文件并现场审核，报告提交MUI作为fatwa依据。两者主体与效力不同，内部评审不能替代LHLN评审。",186,"### 内部评审\n由企业清真管理小组依据PP 39\u002F2021和SJPH手册自查：供应商证书是否在有效期、台账批次是否对应、清洗与隔离是否执行，发现问题自行整改并留存记录。\n### LHLN评审\n福运来作为BPJPH认可的LHLN，独立审阅配方来源、添加剂与加工助剂、现场符合性，审核员与企业无利益关联，审核报告上传BPJPH并供MUI出具fatwa使用。\n### 关系定位\n内部评审是申报前提和日常维护手段，LHLN评审是法定链条中的独立环节；自查再充分也要接受外部审核。\n### 自查表要点\n内部评审可参照SJPH自查表逐项打分：原料验收、仓储标识、产线清洗、人员培训、投诉与纠正各栏均需附证据编号，评审报告经管理者代表签字后归档。内部打分只反映运行状况，不能写成对外结论；对外合规表述以BPJPH证书及MUI fatwa为准。不构成对审核结果的承诺。",[12,17,23,28],{"@type":6,"q":24,"a":25,"id":26,"category":10,"extended":27},"清真认证审核中\"照片\u002F视频留证\"的要求有哪些？","留证需覆盖原料标识、仓储分区、产线与器具清洁、包装喷码等关键节点，照片应有全景与特写并保留拍摄时间，视频按工艺流程连贯录制，体现清真与非清真产品的隔离措施。素材按产品和批次编号归档，供LHLN审核员现场核对及后续fatwa审查调用。",183,"### 必拍清单\n原料库的清真标识与效期、清真与非清真物料分区、专用器具与清洗记录、投料口、包装线喷码、成品批次标签，每个节点拍全景加特写。\n### 视频要求\n从原料进厂、暂存、投料、加工到成品入库连续录制，一镜到底体现无交叉污染；冷冻食品企业还需拍摄解冻与清洗区域。素材保留原始拍摄时间，不要事后补拍摆拍。\n### 归档方式\n以“产品名加批次号”建立文件夹，写入审核证据清单并由清真管理员签字确认。\n### 不合格情形\n常见退回原因：只拍标签特写不拍区位全景，无法证明物料所在库区；视频剪辑跳段、画面无日期；不同批次共用一张照片；喷码模糊无法辨认；拍摄内容与工艺流程图不符。企业应在LHLN到场前按清单自检，缺项立即补拍真实场景，照片由管理员与拍摄人双签，证据清单注明存放路径，审核时按编号逐项展示。不构成对审核结果的承诺。",{"@type":6,"q":29,"a":30,"id":31,"category":10,"extended":32},"清真认证中\"紧急订单\"可以加快拿证速度吗？","商业紧急不构成法定链条的加速理由：BPJPH受理、LHLN审查与现场审核、MUI出具fatwa、BPJPH发证各环节均不可省略。企业能做的是资料齐备、配方定型、及时答复审核疑问；接紧急订单前先确认证书范围，勿把未发证产品当作已认证销售。",187,"### 链条不可省\n依据Law 33\u002F2014与PP 39\u002F2021，BPJPH、LHLN、MUI各有职责，fatwa未出具前BPJPH不会核发证书，紧急函件或买家催促不能改变这一顺序。\n### 企业可控部分\n提前备齐登记表、配方表、供应商证书与SJPH记录，指定专人快速回复审核员问询，原料与产线提前整改到位，这些能减少停顿，但不属于特殊安排。\n### 商务建议\n旺季订单按证书实际状态报价并约定交付条件；证书尚在办理时，对清关与买家均应如实说明。\n### 订单排期对照\n建议销售部门维护证书状态表，逐SKU标注已发证、审核中、未申报三态，报价与交期按状态分级：审核中产品可洽谈，但合同写明以取得证书为交付前提，未申报产品不承诺清真交期。生产端据此安排批次隔离，仓库见证书编号后再放行清真批次，所有确认走书面邮件。不构成对审核结果的承诺。",{"cur":34,"prev":39,"next":43,"related":47},{"@type":6,"q":35,"a":36,"id":9,"category":37,"extended":38},"Can products be added after submission but before the certificate is issued?","Additions are allowed but cannot simply merge into the original application. BPJPH works from the registered product list, so new SKUs need a change filing in SIHalal and a fresh LHLN review of formula and ingredients; if the on-site audit is finished, additional checks may be needed. Additions disrupt the review rhythm, so lock the SKU list and label names at project start.","Process & Timeline","### The rule\nBPJPH reviews exactly the product list registered in the system. A new flavor or size added after submission cannot ride on the original application; it requires a change filing with a fresh formula, ingredient list, and supplier halal certificates.\n### Effect on progress\nIf the file is already at the MUI fatwa stage, additions are typically assessed separately and do not invalidate products already reviewed. A new production line or animal-derived ingredient may require an additional on-site check, at the auditor's discretion.\n### Practical tip\nFreeze the SKU list before filing and keep label names identical to the commercial invoice; if an addition is unavoidable, report it in writing through the LHLN early.\n### Batches and paperwork\nAlready produced stock of an added product is placed under batch isolation with separate labels and must not ship within the declared scope. Do not print outer cartons or invoices for new SKUs before the change receipt is confirmed. Keep change receipts, supplementary emails, and auditor confirmations, and adjust shipping schedules accordingly; several additions filed together in one batch are easier for the audit team to verify than scattered filings. Nothing here constitutes a commitment regarding the audit outcome.",{"@type":6,"q":40,"a":41,"id":15,"category":37,"extended":42},"How do 'initial certification' and 'scope extension' differ in the halal certification process?","Initial certification requires building the SJPH system, full document review, and an on-site audit; after the MUI fatwa, BPJPH issues a four-year certificate. A scope extension adds products, formulas, or lines during the term through a change application; the LHLN reviews only the new content and may conduct a supplementary audit when new ingredients or lines are involved.","### Initial certification\nThe full package - business license, factory layout, SJPH manual, formulas, and supplier certificates - goes to BPJPH. An LHLN performs document review and an on-site audit, MUI issues the fatwa, and BPJPH grants a certificate valid for four years.\n### Scope extension\nAdding SKUs, ingredients, lines, or workshops is a reported change: file it in the SIHalal system with the formula sheet and process diagram. If the new product shares the line and a similar process, document review usually suffices; introducing high-risk new ingredients can trigger a supplementary audit limited to the addition.\n### Note\nThe validity term stays aligned with the original certificate.\n### How to choose\nRead the situation before planning timing: a new entity or new plant should plan for full system building and an initial audit. A certified company first checks whether the addition sits inside its existing lines and ingredient categories; inside means an extension filing, outside (a new workshop, animal-derived ingredients) means preparing for a supplementary audit. List the added documents separately with the company chop rather than mixing them into the original file. Nothing here constitutes a commitment regarding the audit outcome.",{"@type":6,"q":44,"a":45,"id":20,"category":37,"extended":46},"What is the difference between the company's internal review and the LHLN review in halal certification?","The internal review is a self-check the company runs against SJPH requirements, covering ingredients, lines, and records. The LHLN review is an independent assessment by a BPJPH-recognized foreign halal body that examines formula documents and audits the site; its report supports the MUI fatwa. They differ in actor and legal weight, and internal review cannot replace the LHLN stage.","### Internal review\nThe in-house halal team checks itself against PP 39\u002F2021 and the SJPH manual: whether supplier certificates are current, ledgers match batches, and cleaning and segregation rules are actually followed, with corrections recorded.\n### LHLN review\nGood Fortune, as a BPJPH-recognized LHLN, independently examines ingredient sources, additives and processing aids, and on-site compliance. Auditors have no commercial tie to the applicant, and the audit report goes to BPJPH for use in the MUI fatwa.\n### How they relate\nInternal review is a precondition and a routine tool; the LHLN review is an independent stage in the statutory chain. However thorough the self-check, the external audit still takes place.\n### Checklist points\nThe internal review can score the SJPH self-checklist line by line: incoming inspection, storage labels, line cleaning, training, complaints, and correction, each backed by an evidence number, with the signed report archived. Internal scores only describe operating status and must not be turned into outward claims; external compliance statements rest on the BPJPH certificate and the MUI fatwa. Nothing here constitutes a commitment regarding the audit outcome.",[39,43,48,52],{"@type":6,"q":49,"a":50,"id":26,"category":37,"extended":51},"What are the requirements for photo and video evidence during a halal certification audit?","Evidence must cover raw-material labels, warehouse zoning, line and utensil cleaning, and package coding. Photos combine wide and close-up shots with recorded capture times, while videos follow the process flow continuously, showing segregation between halal and non-halal products. Files are indexed by product and batch for the LHLN auditor and the later fatwa review.","### Shot list\nHalal labels and expiry dates in the raw-material store, zoning between halal and non-halal materials, dedicated utensils and cleaning records, dosing points, coding on the packaging line, and finished-goods batch labels; each item needs both a wide and a close-up shot.\n### Video clips\nRecord one continuous take from incoming materials, staging, dosing, and processing through finished-goods storage, showing there is no cross-contamination; frozen-food plants also film thawing and washing areas. Keep original timestamps and never stage retakes.\n### Filing\nName folders by product and batch number, list them in the evidence index, and have the halal supervisor sign it.\n### Typical rejection reasons\nEvidence is frequently sent back for showing a label without a wide shot that proves where it was stored, for edited videos with gaps and no date, for recycling one photo across batches, for illegible coding, or for content that contradicts the process diagram. Run the checklist before the LHLN arrives, film any missing item as a genuine scene, have the halal supervisor and photographer both sign, note the storage path in the evidence index, and present items by number during the audit. Nothing here constitutes a commitment regarding the audit outcome.",{"@type":6,"q":53,"a":54,"id":31,"category":37,"extended":55},"Can an 'urgent order' speed up issuance of the halal certificate?","Commercial urgency is not grounds to shorten the statutory chain: BPJPH acceptance, LHLN review and on-site audit, the MUI fatwa, and BPJPH issuance cannot be skipped by any party. What companies can do is prepare complete documents, finalize formulas, and answer audit questions promptly to avoid idle time. Before accepting urgent orders, confirm certificate scope and arrival timing rather than selling uncertified goods as certified.","### The chain cannot be skipped\nUnder Law 33\u002F2014 and PP 39\u002F2021, BPJPH, the LHLN, and MUI each hold separate responsibilities; BPJPH cannot issue the certificate before the fatwa exists, and buyer pressure does not reorder the sequence.\n### What the company controls\nHave the registration forms, formula sheets, supplier certificates, and SJPH records ready in advance; assign one contact to answer auditor questions quickly; fix ingredients and lines before the audit. These reduce idle time but are not special treatment.\n### Commercial advice\nQuote peak-season orders against the actual certificate status and set delivery terms accordingly; while the application is pending, be transparent with customs and buyers.\n### Order-planning chart\nSales should keep a certificate status table marking every SKU as issued, under review, or not filed, with quotations and lead times graded accordingly: products under review may be discussed, but the contract makes delivery conditional on the certificate, while unfiled products carry no halal delivery promise. Production applies batch isolation, and the warehouse releases halal batches only against a certificate number, with every confirmation by email. Nothing here constitutes a commitment regarding the audit outcome."]