[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"faq-detail-halalcn.com-163":3},{"zh":4,"en":33},{"cur":5,"prev":12,"next":17,"related":22},{"@type":6,"q":7,"a":8,"id":9,"category":10,"extended":11},"java.util.HashMap","配料、制冰等接触产品的生产用水，供应链上要留存哪些检测与管网证据？","生产用水须符合饮用水卫生标准并提供水质检测报告，制冰、配料、清洗等直接接触产品的用水均纳入评估。审核关注水源、管网、储罐和过滤消毒设施，防止非饮用水交叉接入。企业应定期检测并留存报告与维修记录，作为供应链上游风险控制的基础证据。",163,"申请条件与资质","### 基本水质要求\n\n直接接触产品或接触面的生产用水应满足生活饮用水卫生指标，常规检测涵盖微生物、浊度、pH和余氯等项目；报告由具备资质的检测机构出具，并与实际取水点对应。\n\n### 审核关注的设施环节\n\n审核员从水源沿管网查看：自备井防护间距、屋顶水箱加盖加锁、过滤器滤芯更换记录、倒流防止器，以及非饮用水管路的颜色标识，都是常见核查点。\n\n### 异常处置示例\n\n某取水点浑浊度超标时，先停用该支路并挂牌；复检合格前涉及的制冰和配料批次单独隔离评估。处置过程保留检测票据、现场照片和放行签字，形成从发现到关闭的闭环记录。\n\n### 供应链风控建议\n\n将水质报告纳入供应商年度评估，用水点编号并绘制管网图；暴雨或维修后增加检测频次，制冰机和蒸汽用水单独取样。发现异常时封存相关批次并追溯，记录处理结论。以上为一般性说明，不构成对审核结果的承诺。",{"@type":6,"q":13,"a":14,"id":15,"category":10,"extended":16},"食品和化妆品两张证书到期时间不同，续证复核能合并办理吗？","两类产品的法规依据、审查清单和审核员专业不同，不能合并为一张证书，应按食品、化妆品分别建档、分别提交申请。同一厂区可共用部分SJPH体系文件，但配方、原料库、设备与清洁记录须按类别分开；年度复核时同步核对两类证书的有效期与产品变更。",162,"### 为何不能合并申报\n\n食品饮料自2024年10月17日起强制Halal，化妆品等其他品类过渡期至2026年10月17日；二者在BPJPH系统中的产品类别、判定依据和现场审核侧重不同，须分别走受理、审查、fatwa和发证环节。\n\n### 同厂区的隔离要点\n\n原料分区存放、设备专用或按规程转换清洗，含动物源成分的化妆品原料与食品原料严格分开。SC车间与妆字号车间的人流、物流、器具在布局图上分别标注，清洁验证记录分开保存。\n\n### 复核记录留痕\n\n复核会议形成签到表与纪要，两张证书的不符合项分别编号，整改证据对应上传；供应商换版证书及时替换旧件，复核结论由质量负责人签字后归入年度档案，备下一年比对。\n\n### 续证复核怎么做\n\n每年复核时同时检查两张证书的产品清单、供应商证书有效期和配方变更记录；任一类别新增产品都要先评估再投产。费用按各自申请分别核算，具体以正式书面评估为准，不构成对审核结果的承诺。",{"@type":6,"q":18,"a":19,"id":20,"category":10,"extended":21},"厂区平面布局图提交后常因哪些问题被退回，图纸版本怎么管理？","需要。平面图是文件审查和现场审核的必备材料，应标明车间分区、人流物流、仓储、清洗区和排水方向，详细程度以能看清原料、半成品、成品流向及清真与非清真区域隔离为准，无需装修效果图。RCEP关税优惠属于原产地规则范畴，与认证申请材料无直接关联。",164,"### 图纸应包含的内容\n\n至少包括厂区总平面图与各车间平面图：标注原辅料仓、成品仓、化学品暂存点、生产动线、人员通道、清洗水池、地漏排水方向及防鼠防虫设施，多楼层要说明竖向物流。\n\n### 常见的退回原因\n\n图纸与现场不一致、未标注清真与非清真隔离、清洁剂和润滑油存放点缺失、排水流向可能造成倒流，是文件阶段最常见的补正原因。\n\n### 图纸版本管理\n\n图纸标注版本号与绘制日期，修订处用云线标识并重新签字；车间改造后同步换版，提交机构的版本须与现场及消防、环评材料一致，避免多版本图纸在审核时互相矛盾。\n\n### 与RCEP的关系\n\nRCEP优惠关注原产地资格与单证申报，布局图不用于关税核算；出口企业可分别准备两套材料，认证图纸突出隔离与流向，原产地资料另按海关要求编制。文件清单以正式书面评估为准，不构成对审核结果的承诺。",[12,17,23,28],{"@type":6,"q":24,"a":25,"id":26,"category":10,"extended":27},"联盟共用配方的多款新品，能否只做一次认证就同时上市？","不可以。BPJPH证书以单一持证主体（通常为生产企业）和具体生产场所为单位核发，联盟不是法律主体，不能共用一张证书。联盟内各工厂须分别申请、分别审核；可统一原料标准和供应商名录以减少重复工作，但证书各自独立、产品分别标注。",161,"### 证书主体的基本规则\n\nBPJPH证书登记企业名称、工厂地址和产品清单，一张证书对应一个法律主体和一处经审核的生产场所。产业联盟、商会或采购联盟均不具备持证资格，成员企业即使共用品牌也须各自申报。\n\n### 新品上市前的自查建议\n\n联盟可统一组织配方比对、供应商清真文件收集和SJPH制度模板共享，再由各厂按自身产线落地。新品上市前逐厂核对原料、包材和清洗记录，避免某一成员的不合规原料拖累整批上市节奏。\n\n### 上市节奏统筹\n\n联盟设一张新品甘特表，把各厂配方定稿、包材采购和送检节点放在同一页按周核对；某厂原料证书未到不得提前排产，新品放行单由各厂质量负责人分别签字，联盟只汇总不替代放行。\n\n### 协同中的注意点\n\n委托加工关系要在登记表中如实填写委托方与被委托方；联合品牌产品须能追溯到实际持证工厂。各厂文件分开归档、批次分开追溯，结论以BPJPH系统登记为准。本说明不构成对审核结果的承诺。",{"@type":6,"q":29,"a":30,"id":31,"category":10,"extended":32},"厂房还在装修，配方和体系审查能不能先跑，现场审核什么时候安排？","可以先递交资料、启动配方与体系审查，但LHLN现场审核须在车间完工、设备就位并能试运行后实施。LHLN作为BPJPH认可的外国清真认证机构，依据现场实际状态判定是否具备审核条件；图纸阶段可先远程沟通，施工未完成时不安排正式审核。",165,"### LHLN如何看待装修进度\n\nLHLN审核员核对真实运行状态：隔离墙体、排水通风、设备清洁与标识必须落地，效果图和进度表不能替代现场；施工仍在进行时审核只能中止或改期。\n\n### 前期可推进的工作\n\n配方表、原料规格、供应商证书和SJPH制度文件不受装修影响，可先提交审查；人员到位后开展清真意识培训并签到，设备进场前确认润滑油、密封件为清真合规型号。\n\n### 远程沟通怎么做\n\n装修中期把施工照片和设备清单发给项目组，就隔离墙位置、地漏间距和洗消池数量逐项确认；沟通纪要留存，进场设备合格证与润滑油型号登记造册，供正式审核时核对。\n\n### 验厂时机建议\n\n在设备调试完成、首批清洁验证合格、试生产批次记录可追溯时约审；审核前完成一次内部模拟检查，重点看施工残留物料清场。费用构成含BPJPH规费、LHLN审查费和现场差旅，以书面评估为准，不构成对审核结果的承诺。",{"cur":34,"prev":39,"next":43,"related":47},{"@type":6,"q":35,"a":36,"id":9,"category":37,"extended":38},"For batching and ice water that contacts products, which test and pipework records must be kept?","Production water must meet drinking-water hygiene standards, supported by test reports. Water used for ice, batching and cleaning that contacts products is all assessed. Audits examine the source, pipe network, tanks and filtration and disinfection facilities to guard against cross-connection with non-potable water. Test periodically and retain reports and maintenance records as basic evidence of upstream supply chain risk control.","Application Requirements","### Basic water requirements\n\nWater directly contacting products or product-contact surfaces should meet drinking-water indicators covering microbiology, turbidity, pH and residual chlorine. Reports come from qualified laboratories and correspond to the actual sampling points.\n\n### Facilities auditors examine\n\nAuditors follow the network from the source: protection distances for private wells, locked covered roof tanks, filter-cartridge replacement records, backflow preventers and color coding of non-potable lines are common checks.\n\n### Example of deviation handling\n\nIf a sampling point shows excess turbidity, stop using that branch and tag it; isolate the ice and batching batches made before the retest passes. Keep test receipts, photos and the signed release note so the handling forms a closed loop from finding to closure.\n\n### Supply chain risk control\n\nInclude water reports in the annual supplier assessment, number each use point and draw a pipe-network diagram. Increase testing after storms or maintenance, and sample ice machines and boiler-feed water separately. If results are abnormal, hold the affected batches, trace them and record the conclusion. This is general guidance, and nothing here constitutes a commitment regarding the audit outcome.",{"@type":6,"q":40,"a":41,"id":15,"category":37,"extended":42},"If the food and cosmetics certificates expire at different times, can their renewals be combined into one review?","The two product types cannot be merged into one certificate because their legal basis, review checklists and auditor expertise differ. Build files and submit applications separately for food and cosmetics. One site may share some SJPH documents, but formulas, ingredient stores, equipment and cleaning records must be split by category. At the annual review, check validity periods and product changes for both certificates together.","### Why they cannot be combined\n\nFood and beverages have been mandatory halal since October 17, 2024, while cosmetics and other categories run to October 17, 2026. Their BPJPH categories, decision bases and audit focus differ, so each goes through acceptance, review, fatwa and issuance separately.\n\n### Separation on a shared site\n\nIngredients are stored in separate zones, equipment is dedicated or converted under validated cleaning, and animal-derived cosmetic materials are strictly separated from food materials. People flows, material flows and utensils for the SC and cosmetics workshops are marked separately on the drawings, and cleaning verification records are kept apart.\n\n### Keeping review evidence\n\nThe review meeting produces an attendance sheet and minutes, nonconformities for the two certificates are numbered separately, and rectification evidence is uploaded against each item. Replaced supplier certificates are updated, and the signed conclusion enters the annual file for the next year's comparison.\n\n### Running the renewal review\n\nAt the annual review, check product lists, supplier certificate expiry dates and formula change records for both certificates. Any new product in either category is assessed before production. Fees are calculated per application; the formal written assessment prevails, and nothing here constitutes a commitment regarding the audit outcome.",{"@type":6,"q":44,"a":45,"id":20,"category":37,"extended":46},"Why is a submitted factory layout plan often sent back, and how should drawing versions be controlled?","Yes. The layout plan is essential for document review and the site audit, showing workshop zones, people and material flows, storage, cleaning areas and drainage direction. It needs enough detail to trace ingredient, semi-finished and finished-goods flows and halal\u002Fnon-halal separation; decoration renderings are unnecessary. RCEP tariff preferences belong to rules of origin and are not directly linked to certification documents.","### What the drawings should contain\n\nAt minimum, an overall site plan and workshop plans marking raw and packaging stores, finished-goods warehouses, chemical holding points, production routes, staff passages, cleaning sinks, floor-drain directions and pest-control facilities. Multi-floor sites should show vertical material movement.\n\n### Common rejection reasons\n\nDrawings that do not match the site, missing halal\u002Fnon-halal separation, unmarked storage for cleaning agents and lubricants, and drainage that could backflow are the most frequent document-stage corrections.\n\n### Drawing version control\n\nLabel drawings with a version number and date, mark revisions with cloud lines and re-sign, and update the version after workshop modifications. The submitted copy must match the site and the fire and environmental materials so competing versions never contradict each other.\n\n### Relationship with RCEP\n\nRCEP preferences concern origin qualification and customs documentation; layout plans are not used in duty calculations. Exporters can prepare two sets separately: certification drawings emphasizing separation and flows, and origin documents compiled per customs requirements. The document list follows the formal written assessment, and nothing here constitutes a commitment regarding the audit outcome.",[39,43,48,52],{"@type":6,"q":49,"a":50,"id":26,"category":37,"extended":51},"For several new products sharing one formula through an alliance, can a single certification cover them all at launch?","No. A BPJPH certificate is issued to a single holder, normally the manufacturer, and a specific production site. An alliance is not a legal entity and cannot share one certificate. Each member factory must apply and be audited separately. They can align ingredient standards and supplier lists to reduce duplicate work, but certificates stay independent and products are labeled individually.","### Basic rules for the holder\n\nA BPJPH certificate records the company name, factory address and product list; one certificate matches one legal entity and one audited site. Alliances, chambers and purchasing groups cannot hold a certificate, and members must each file separately even when sharing a brand.\n\n### Self-check before a new product launch\n\nThe alliance can jointly run formula comparison, collect supplier halal documents and share an SJPH procedure template, which each factory implements on its own lines. Before launch, check ingredients, packaging and cleaning records factory by factory so one member's non-compliant material does not hold up the whole batch.\n\n### Coordinating launch timing\n\nKeep one shared Gantt chart showing each factory's formula sign-off, packaging procurement and testing milestones, reviewed weekly. A factory may not schedule production before its ingredient certificates arrive, and each quality manager signs the new-product release note separately.\n\n### Coordination points\n\nContract-processing relationships must truthfully state the principal and processor on the registration form, and co-branded products must trace to the actual certified factory. Files and batches are archived separately per factory, and BPJPH system records prevail. Nothing here constitutes a commitment regarding the audit outcome.",{"@type":6,"q":53,"a":54,"id":31,"category":37,"extended":55},"With the factory under fit-out, can formula and system review start first, and when is the site audit?","Documents can be submitted and formula and system review started early, but the LHLN site audit takes place only after the workshop is complete, equipment is in place and commissioning is feasible. As a foreign halal certification body recognized by BPJPH, the LHLN judges from actual site conditions. Remote consultation can happen at the drawing stage; no formal audit is scheduled while construction continues.","### How the LHLN views fit-out progress\n\nAuditors verify actual operating conditions: separating walls, drainage and ventilation, equipment cleanliness and labeling must all be in place. Renderings and schedules cannot replace the site, and an audit during construction can only be suspended or rescheduled.\n\n### Work that can move forward\n\nFormula tables, material specifications, supplier certificates and SJPH procedures are unaffected by fit-out and can be reviewed first. Once staff arrive, run halal-awareness training with attendance records, and confirm halal-compliant lubricants and seals before equipment arrives.\n\n### Running remote consultation\n\nMidway through fit-out, send construction photos and equipment lists to the team and confirm wall positions, drain spacing and the number of cleaning sinks item by item. Keep the minutes, and register equipment certificates and lubricant models for checking at the formal audit.\n\n### When to request the audit\n\nBook it after commissioning, once the first cleaning verification passes and trial-batch records are traceable. Do an internal mock audit first, focusing on clearance of construction residues. The fee structure covers BPJPH charges, the LHLN review fee and on-site travel; the written assessment prevails, and nothing here constitutes a commitment regarding the audit outcome."]