[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"faq-detail-halalcn.com-150":3},{"zh":4,"en":33},{"cur":5,"prev":12,"next":17,"related":22},{"@type":6,"q":7,"a":8,"id":9,"category":10,"extended":11},"java.util.HashMap","申请清真认证需要提供“厂区平面布局图”吗？需要详细到什么程度？","需要，它是SJPH体系文件的组成部分。图上应标明厂区边界、人流与物流入口、原料包材成品仓库、危化品存放点、车间分区、主要设备位置、给排水方向，并由负责人签字盖章；布局变更后须同步更新版本。",150,"申请条件与资质","### 用途定位\n厂区平面布局图是SJPH文件的基础材料，审核员据此判断人流、物流是否交叉，清真区域与潜在污染源是否隔离；首次会议即用该图介绍全厂。\n### 标注要素\n画出围墙边界、各出入口、原料包材成品及危化品仓库、车间功能间、设备定位、给排水与防虫设施，标注比例尺寸；设备编号与现场铭牌一致，不同区域可用颜色区分。\n### 格式要求\nCAD或A3手绘均可，图纸清晰，由负责人签字盖章、注明版本日期，与SJPH文件清单对应；装修搬迁后及时更新。用箭头标明原料从待验区、合格区到投料口以及成品下线、暂存、发运的方向，不合格品区单独画出上锁；电子版PDF归档，文件名注明厂区与版本号，讲解人由能回答流向问题的生产或质量负责人担任。福运来哈啦为BPJPH认可的LHLN，本内容不构成对审核结果的承诺。",{"@type":6,"q":13,"a":14,"id":15,"category":10,"extended":16},"申请BPJPH对“生产用水”有什么水质要求？","与产品直接或间接接触的水须符合生活饮用水卫生标准，不得含有教法认定的污秽物。市政供水留存水质报告，自备井要设防污染设施并定期检测；管网不得与回用水设施交叉连接，制冰和清洗用水同此标准。",149,"### 基本标准\n生产用水包括配料、清洗、冷却、制冰及锅炉蒸汽用水，须符合生活饮用水卫生标准，不得混入教法认定的污秽物。\n### 不同水源的要求\n市政供水保留水质检测报告；自备井水须设防护距离、加盖上锁并定期检测；净化设备滤芯更换有记录。审核员查看近一个运行周期的报告、采样点分布图与水龙头编号。\n### 管网与核查\n饮用水管与中水、回用水管清晰标识、杜绝交叉连接，排水不得倒灌车间，污水站与车间保持高差；冷却塔飘洒风险同样评估，直接接触产品的净水还要核查电导率记录与膜组件清洗周期；洗手龙头采用非手动开关，地漏水封保持水位并有巡查记录；采购桶装净水留存票据和报告复印件，审核员可能现场接水观察浑浊度并询问清洗频次。停水预案写明替代水源如何验证。本说明不构成对审核结果的承诺。",{"@type":6,"q":18,"a":19,"id":20,"category":10,"extended":21},"新厂房装修期间，能提前申请清真认证吗？","文件准备可以先行，包括主体资料、配方原料表、SJPH手册和员工培训；但现场审核须在设备安装到位并已试生产后进行，审核员需看到真实运行记录。可先递交申请并注明预计完工时间，证书地址须与实际厂址一致。",151,"### 哪些环节可以先行\n主体登记、产品配方、原料台账、SJPH手册编写与员工培训都可在装修期推进，LHLN可先开展文件审查，使装修结束后即可安排现场审核。\n### 现场审核的前提\n设备安装到位并完成试生产，现场有投料、批次、清洁记录可供核查；未完工工地无法确认隔离与流向，不具备审核条件。\n### 操作建议\n可先递交申请并注明预计完工时间，证书地址按实际厂址填写；搬迁后布局变化须更新图纸并重新核对。装修材料进场前核对粘接剂、防水涂料的成分说明，避免封闭空间大量使用挥发物；新仓库通风、防爆灯具与门禁随主体工程同步验收，设备先空载运行和清洁验证再安排试生产。老厂原料包材盘点造册，防止未评审物料带入新址；培训签到与考核记录提前归档，水电气管路在图上更新。以上不构成对审核结果的承诺。",[12,17,23,28],{"@type":6,"q":24,"a":25,"id":26,"category":10,"extended":27},"生产企业同时拥有食品生产许可（SC）和化妆品生产许可（妆字号），如何申请清真认证？","食品与化妆品属不同品类，应分别申报、分别列产品清单，审核依据不同、证书分别核发。现场审核可安排同期进场但分组检查；两条产线须物理分隔，共用工器具需清洁验证，原料库分区管理。",148,"### 分品类申报\n食品按2024年10月17日强制节点管理，化妆品在2026年10月17日前完成；两类产品分别填表、审查、发证，SC与妆字号资质分别附上，产品编号可用不同前缀区分。\n### 现场安排\n审核组可同期进厂、按两份清单分组检查。产线物理隔断，共用水池、灌装机须做清洁验证并保留记录；甘油、乳化剂等重点核查来源、分区存放，两套体系分别指定负责人。\n### 费用与取证\n费用按BPJPH官方规费、LHLN审查费及现场差旅分别计算；两份证书到期日可能不同，台账分别标注。内部审核记录分开装订，两组人员避免同时段交叉作业；原料标签用不同颜色卡片，成品出库单标注品类前缀，共用更衣间分时段使用并清洁，洗手设施分开配置，抹布拖把分区挂放。以正式书面评估为准，本内容不构成对审核结果的承诺。",{"@type":6,"q":29,"a":30,"id":31,"category":10,"extended":32},"申请BPJPH的产品有最小产量或最小产能要求吗？","没有最低产量、产值或产能门槛，小微企业和家庭式作坊只要主体登记合法、有固定场所、工艺真实、原料可溯源，都可申请。审核范围按申报产品确定，小批量试制品也可纳入，批次隔离和投料记录需完整。",152,"### 没有产能门槛\nBPJPH规则不设最低产量、年产值或设备规模要求，手工小批量产品同样受理，适用规则源于Law 33\u002F2014与PP 39\u002F2021。\n### 获证的真正条件\n主体登记合法、有固定生产场所、工艺与配方明确、原料可溯源，并按SJPH运行；新品试制批次应单独标识、隔离存放并留存记录。\n### 费用说明\n费用构成含BPJPH官方规费、LHLN审查费和现场审核差旅，共用场所分时段生产的，排班表注明清真时段与清洁确认人；手工灌装每批留存首件标签照片，场所证明地址与申请表一致，试销订单登记批号、产量与去向。新品自查对照配方表逐项标注供应商和来源地，原料替换重新评审并留存版本记录，小批次单独存放并挂标识卡。微型企业按同样结构计费，具体以正式书面评估为准，不构成对审核结果的承诺。",{"cur":34,"prev":39,"next":43,"related":47},{"@type":6,"q":35,"a":36,"id":9,"category":37,"extended":38},"Is a factory layout plan required for halal certification, and how detailed must it be?","Yes, the layout plan is part of the SJPH documentation. It should show the site boundary, personnel and material entrances, raw-material, packaging and finished-goods warehouses, chemical storage points, workshop zones, major equipment locations, and water and drainage routes, signed and stamped by the responsible person, with a new version after any layout change.","Application Requirements","### Purpose\nThe layout plan is a core SJPH document. Auditors use it to judge whether personnel and material flows cross and whether halal areas are separated from contamination sources; it opens the whole-site introduction at the audit's first meeting.\n### Elements to mark\nShow the boundary wall, entrances, warehouses for ingredients, packaging, finished goods and chemicals, workshop rooms, equipment positions, water supply, drainage and pest-control devices, with a scale or dimensions; equipment numbers match the on-site plates, and zones may use color coding.\n### Format\nCAD or an A3 hand drawing both work. Keep drawings legible, signed, stamped, dated and versioned, aligned with the SJPH document list, and updated after renovation or relocation. Arrows show material flow from quarantine through released storage to dosing, and from the line to staging and dispatch, with a separate locked reject area; archive a PDF whose filename names the site and version, and brief a production or quality manager who can answer flow questions. Good Fortune is a BPJPH-recognized LHLN, and nothing here constitutes a commitment regarding the audit outcome.",{"@type":6,"q":40,"a":41,"id":15,"category":37,"extended":42},"What water-quality requirements does BPJPH impose on production water?","Water that touches the product directly or indirectly must meet drinking-water sanitary standards and be free from substances considered najis. Mains water needs retained test reports; private wells need contamination protection and periodic testing. Pipelines must not cross-connect with recycled-water systems, and the same standard applies to ice and cleaning water.","### Baseline standard\nProduction water covers mixing, washing, cooling, ice and boiler steam; it must meet drinking-water sanitary standards and contain nothing classed as najis.\n### By source\nMains water requires retained test reports; private wells need protection distances, locked covers and scheduled testing; filter changes on purification units must be logged. Auditors review the latest cycle's reports, the sampling-point map and numbered taps.\n### Pipelines and checks\nPotable and recycled-water pipes need clear markings with no cross-connections, drains must not backflow into workshops, and the wastewater station sits at a height difference from production; cooling-tower drift risk is assessed too, and Purified water in direct product contact also requires conductivity logs and membrane-cleaning schedules, taps use non-manual switches, and floor drains keep their water seals with inspection logs; retain delivery receipts and report copies for purchased bulk purified water, as auditors may draw a glass to inspect its clarity and ask about cleaning frequency. The outage plan states how replacement water is verified. Nothing here constitutes a commitment regarding the audit outcome.",{"@type":6,"q":44,"a":45,"id":20,"category":37,"extended":46},"Can a company apply early for halal certification while a new factory is still being fitted out?","Documents can be prepared in advance, including entity papers, formula and ingredient lists, the SJPH manual and staff training, but the on-site audit takes place only after equipment is installed and trial production has started, because auditors must see real operating records. You may file early noting the expected completion date, and the certificate address must match the actual site.","### What can start early\nEntity documents, formulas, ingredient ledgers, the SJPH manual and staff training can all progress during fit-out, and the LHLN may begin document review so the on-site audit can be arranged once construction ends.\n### Preconditions for the audit\nEquipment must be installed with trial production completed, and real dosing, batch and cleaning records available for review; an unfinished site cannot demonstrate separation or flows.\n### Practical steps\nFile the application noting the expected completion date, use the actual site address on the certificate, and revise the layout plan after the move. Check composition data for adhesives and waterproof coatings before entry, avoid large volatile volumes in enclosed spaces, accept ventilation, explosion-proof lighting and access control with the main build, and run equipment empty with cleaning verification before trial batches. Inventory old-site ingredients and packaging so unreviewed materials do not enter the new address, file training attendance and assessment records in advance, and update utility lines on the drawings. Nothing here constitutes a commitment regarding the audit outcome.",[39,43,48,52],{"@type":6,"q":49,"a":50,"id":26,"category":37,"extended":51},"How should a manufacturer with both a food production licence (SC) and a cosmetics production licence apply for halal certification?","Food and cosmetics are different product categories and must be filed separately, with separate product lists, checklists and certificates. The on-site audits can happen during the same visit but follow separate tracks; the two lines need physical separation, shared equipment requires cleaning verification, and ingredient warehouses must be zoned.","### Separate categories\nFood follows the mandatory date of October 17, 2024, while cosmetics have until October 17, 2026. Each category gets its own form, review and certificate, the SC and cosmetics permits are attached separately, and product codes may use different prefixes.\n### On-site arrangement\nAuditors can enter in the same visit but work from two checklists. Lines are physically separated; shared tanks or fillers need documented cleaning verification, ingredients such as glycerin and emulsifiers receive focused source checks and zoned storage, and each system has its own appointed lead.\n### Fees\nCharges combine BPJPH official fees, the LHLN review fee and audit travel; the two certificates may expire on different dates, so the registry marks them separately. Internal audit records are filed separately, the two teams avoid overlapping shifts, ingredient labels use different color cards, outbound orders carry the category prefix, and a shared changing room is used in cleaned, time-split slots, washing facilities are separate, and cloths and mops hang in their assigned zones. The formal written assessment prevails, and nothing here constitutes a commitment regarding the audit outcome.",{"@type":6,"q":53,"a":54,"id":31,"category":37,"extended":55},"Is there a minimum output or production-capacity requirement for BPJPH applications?","There is no minimum output, revenue or capacity threshold. Micro businesses and household workshops may apply as long as they are legally registered, have fixed premises, a genuine process and traceable ingredients. The audit scope follows the declared products; small trial batches can be included, provided batch isolation and material-usage records are complete.","### No capacity threshold\nBPJPH rules set no minimum output, revenue or machinery scale; small handmade batches are accepted under Law 33\u002F2014 and PP 39\u002F2021.\n### Real qualifying conditions\nLegal registration, fixed premises, a defined process and formula, traceable ingredients and a functioning SJPH; trial batches should be marked and isolated separately.\n### Fees\nThe fee structure includes BPJPH official charges, the LHLN review fee and on-site travel; micro businesses follow the same structure, and the formal written assessment prevails. Where shared premises run time-split production, the roster names the halal slot and cleaning confirmer, hand filling keeps a first-piece label photo per batch, the site proof matches the application address, and trial lots record batch number, volume and destination. Self-checks map each supplier and origin to the formula sheet, ingredient substitutions are re-reviewed with version records, and small batches sit separately with status cards. Nothing here constitutes a commitment regarding the audit outcome."]